Date:
11/03/2025
Location:
Online_Mechanised rehabilitation works in tunnelling
This instalment of the Lunchtime lecture series will focus on 'Mechanised rehabilitation and lining works in tunnelling' in collaboration with ITAtech & WG 14.
The episode will feature three lectures and will finish with a Q&A with all speakers. It will begin at 13:00 CET.
- TES and LEM – two examples of current developments in mechanised tunnel renewal and installation of precast segmental lining – Volker Brening
- Experience with the renovation of the Fachinger & Cramberger Tunnel with a mechanised tunnel enlargement system – Ulf Kirsten
- Innovative precast segment lining of a pair of ‘D’ shaped, road header excavated decline tunnels by using a Lining Erection Machine - Gusztav Klados
Thanks to the generous support of our sponsors:
ITA Lecturers
Gus
KLADOS
MMC Gamuda